Many of W.E. Bowers' numerous major renovation projects were
carefully completed in operational buildings. Our renovation
experience also includes developing detailed project phasing
and sequencing plans, skillfully addressing unknown conditions,
and coordinating mechanical systems installations with the
general contractor and other trades.
Representative projects include:
One Washington Circle
Washington, D.C.
$2 million
- hotel renovation
The Smithsonian Institute
Washington, D.C.
$2 million
- renovation
Old Patent Office Building
Washington, D.C.
$600,000
- renovation
Metro Police Department 6th District Headquarters
Washington, D.C.
$800,000
- new rooftop air handler and VAV system
- boiler and hot water pump replacement
- steam converter and hot water system
- Direct Digital control system
- complete replacement of existing domestic water piping
National Center for Missing and Exploited Children
Arlington, Virginia
$1.2 million
- air handler and VAV system
- cooling tower, boiler, and heat exchanger
- supplemental water source heat pumps
- Direct Digital control system
- complete core plumbing renovation with additional pantries
1333 New Hampshire Avenue
Washington, D.C.
$1 million
- replacement of 22 air handling units
- fuel oil piping for emergency generator ductwork
The Atrium Building
Alexandria, Virginia
$1 million
- replacement of fan coil units
- replacement of HVAC system
- replacement of plumbing system
Brookings Institute
Washington, D.C.
$1.8 million
- replacement of mechanical and plumbing systems in an occupied
building
- new chiller
- new cooling tower
- four pipes for fan coil system
- new plumbing riser and fixtures
DAR/Constitution Hall
Washington, D.C.
$1.4 million
- renovation of an occupied building
- new chiller
- cooling towers
- pumps and piping
- ductwork
- controls
- new site utilities including water, sanitary sewer, and
storm sewer
1030 15th Street
Washington, D.C.
$1.1 million
- complete air handling unit replacement
- temperature controls
- fan coil cabinet replacement
- new plumbing fixtures
- extensive HVAC work
American Chemical Society
Washington, D.C.
$1.2 million
- new chillers
- ductwork
- complete four-pipe fan coil system with piping
- new kitchen HVAC system
- new plumbing fixtures, piping, and complete kitchen plumbing
system
- new water and sanitary sewer service
American Federation of Teachers
Washington, D.C.
$1.5 million
- renovation of an occupied building; work performed at night
- new chiller
- new control system
- complete core bathroom renovation
- new VAV system
- ductwork